Operations

The Operations tab controls which automated jobs are enabled for this data source. Each operation toggle creates a dedicated Job Definition in the Operations area — but does not start or schedule the job automatically.

You need Admin or Builder role to manage data source operations.


Available Operations​

OperationDescription
Full Data LoadEnables a job to perform a complete reload of all data from the source into ClickHouse
Incremental Data LoadEnables a job to load only new or changed data since the last run
Create Semantic LayerEnables a job to build the initial semantic layer for this data source
Update Semantic LayerEnables a job to update the existing semantic layer after schema or data changes
Delete Semantic LayerEnables a job to completely remove the semantic layer for this data source
Clear DatasourceEnables a job to remove all loaded data for this data source from ClickHouse

How Enabling an Operation Works​

Toggling an operation to enabled does the following:

  1. A Job Definition is created in the Operations area for that operation type.
  2. Once the Job Definition is ready, a link — Open Job Definition — appears directly below the toggle.
  3. Click the link to navigate to the Job Definition and configure when and how it should run.
important

Enabling an operation does not start the job and does not set a schedule. It only creates the Job Definition. The Builder or Administrator must explicitly open the Job Definition and decide:

  • Whether to run it manually (one-time trigger)
  • Whether to set a cron schedule for recurring execution

The timing and frequency of data loads or semantic extraction jobs depends on the specific data source and use case. This is a deliberate decision by the modeler — not an automatic process.


Configuring the Schedule​

After enabling an operation and clicking Open Job Definition:

  1. The Job Definition editor opens in the Operations section.
  2. Set the Schedule (Cron) field to define when the job should run automatically.
  3. Leave the schedule empty if you want to trigger the job manually only.
  4. Click Trigger Job to run it immediately for the first time.

For detailed instructions on cron schedules, task configuration, and manual triggering, see the Operations guide.


Choosing the Right Schedule​

There is no universal schedule — the right interval depends on your data source and business requirements:

ScenarioSuggested approach
Source data changes dailyIncremental Load daily, e.g. 0 2 * * *
Source schema rarely changesUpdate Semantic Layer weekly or on-demand
Initial setupRun Full Load and Create Semantic Layer manually once
High-frequency source dataIncremental Load multiple times per day
Static or infrequently updated sourceManual trigger only, no schedule

Data Source Status After Operations​

The data source list and detail view show the current state of each data source. After operations complete, the status reflects what has been done:

StatusWhat it means
CreatedData source connection is configured but no data has been loaded yet
LoadedA Full Load or Incremental Load has completed — data is available in ClickHouse
Semantic Layer CreatedSemantic extraction has completed — the data source is trained and ready to be used in a Custom Model
ValidatedThe data source has been reviewed and confirmed as production-ready

A data source must reach Semantic Layer Created status before it can be effectively used as a building block in a Custom Model. Only trained data sources produce meaningful analytical results.


When to Re-run Semantic Extraction​

Semantic extraction is resource-intensive and should not be run routinely. Re-run it only when the data structure changes — not when data values change:

ChangeAction needed
New tables or columns added to the sourceRe-run Update Semantic Layer
Existing columns renamed or removedRe-run Update Semantic Layer
Data values updated (new rows, changed values)Re-run data load only — no semantic re-extraction needed
Schema unchanged, data quality improvedOptionally re-run extraction; not required if structure is the same

If only data values change (which is the typical case in production), a new data load is sufficient. Semantic extraction does not need to be repeated.


Job History​

After jobs have been triggered, the Job Runs area in the Operations section shows execution history, status, and logs. Use this to verify that loads and extractions completed successfully and to diagnose failures.

Navigate to Operations → Job Runs or use the View Runs button in the Job Definition editor.